Tennis Strategy

This study was commissioned following recommendations presented in the Draft Mornington Peninsula Active Sports Strategy. This document provides a strategic assessment of all Mornington Peninsula Shire tennis facilities and their capacity to cater for current and future use. The Strategy was updated in 2012 to include recommendations of the Tennis Facilities Audit undertaken in 2011/12.

Format

Report

Geographic Coverage

Victoria

Notes

Prepared by ‘@leisure

Source

Shire of Mornington Peninsula: 2012

Attachments

Article Attachments